LNG Loading Solutions
The future of LNG
Natural Gas is an important cornerstone of our energy supply and the fastest-growing major fuel source. Used commonly for both heat and fuel, burning natural gas produces less CO2. Natural gas is more efficient and reliable than renewable energy and is cleaner than coal and oil. But transporting gas is not easy - which is where Liquefied Natural Gas (LNG) comes in.
It is far more economical to turn natural gas into LNG and transport it by ship since most of the world's natural gas reserves are stranded far from any market.
Emco Wheaton’s LNG Loading Arms are designed to meet the specific requirements of LNG loading and unloading applications at a processing plant. We are able to configure your marine loading arm based on your project needs.
Marine Loading Arm - B0300
Designed for any application where it is essential to keep the product pipe consistently the same size for either economical or technical reasons, e.g. cryogenic products down to -168 °C, piggable systems and PTFE-lining.
Learn More
Marine Loading - Hydraulic QC/DC Coupler for LNG
This variant of our hydraulic QC/DC coupler is specifically designed for the transfer of LNG. High-strength alloy construction ensures infallible performance in temperatures as low as -200°C.
Learn More
Emergency Release System (ERS) for LNG
The Emco Wheaton ERS (Emergency Release System) for LNG is specifically designed to enable rapid and secure disconnection of the LNG Marine Loading Arm. This key element ensures the loading arm is safely disconnected before the LNG carrier becomes out of reach.
Learn More
Bottom Loading Station
This type of loading arm is specially designed to load products where vapour return is necessary.
Learn More
Bottom Loading & Unloading
Bottom transfer arms are especially designed to load products where vapor return is necessary while providing an extended reach that makes them ideal for applications where a vehicle cannot be accurately spotted.
Learn More
LNG Loading Arm Operation
Emco Wheaton has the pedigree, knowledge, innovative attitude and skills required to produce world-leading equipment which will solve all your LNG loading needs. In addition to their expertise in cryogenic marine loading arms, Emco Wheaton has successfully designed, built, and delivered complete marine loading packages tailored to LNG and high-pressure natural gas applications.
Key Benefits
We leverage our experience and expertise to provide our customers with engineered LNG loading solutions that deliver benefits such as:
- Maximum Safety. Our marine loading arms are designed to meet the stringent safety and availability requirements of the LNG industry. They are designed to ensure the right balance throughout all maneuvering and connecting positions. Our Emergency Release System (ERS) guarantees safe operation by allowing for the rapid and automatic release of the loading arm from the LNG tanker in the event of an emergency.
In addition, Emco Wheaton’s ERS is able to simulate an emergency without real disconnection. For truck (un)loading of LNG, we provide bottom loading from the ground to be inherently safer for the operator.
High Quality. Depending on your operational needs, the loading arms can be equipped with a robust high-quality support structure and a range. We use the best materials and components to provide you with a robust and durable marine loading arm.
Easy Handling. Our LNG loading arms are designed for easy use and handling. - Full Project Management Support. From conceptual design to construction, commissioning and aftermarket services. A dedicated project management team is allocated to every LNG project run by Emco Wheaton. Emco Wheaton has been delivering LNG projects for decades.
We work with a range of EPC (Engineering, Procurement and Construction) and energy companies to meet demanding technical requirements and unique needs. Project managers take part in the sales negotiation process to ensure they have solid knowledge of the project from start to finish. - Minimum maintenance. Emco Wheaton’s LNG loading arms have a simple and maintenance friendly design. Our dedicated service team offers you full aftermarket support.
Service Support. Emco Wheaton is part of the Ingersoll Rand group. With an extensive network of skilled and certified service engineers, we have the ability to support any cryogenic application, including LNG requests.
Safety Considerations in LNG Operations
As a cryogen, LNG must be transferred and stored in specialized equipment and tanks in order to keep the fuel in a liquid state. Emco Wheaton LNG marine and distribution loading arms have been developed to meet the stringent standards demanded of the industry.
Our engineers understand the requirements of the industry. They work closely with our project managers and clients to create products that meet all their needs.
We have formed a robust knowledge base via our industry links. We ensure a range of provisions are included in our products to ensure their safe operation.
- The use of hydraulic couplers to reduce operator interaction
- The use of an emergency release system
- The use of robust control systems
Maintaining LNG-handling equipment regularly is a necessity. We offer service contracts delivered by LNG technicians.
Quality Standards
Emco Wheaton meets the industry’s high standards on safety and reliability. The safety and integrity of our customers’ operations are our top priority. This is why our range of products are engineered to meet and exceed the highest levels of quality possible.
The Importance of Project Management
Emco Wheaton has delivered LNG projects for decades. We extensively work with EPCs, and we are aware of the need for a precise quote and project plan.
A dedicated project management team is allocated to every LNG project run by Emco Wheaton. The importance of a good team and a good process cannot be underestimated. We have achieved great business results with the help of our first-class project management professionals.
A well-run project is the difference between delivering a successful outcome and one plagued with issues from start to finish. We employ project managers with years of experience both through their time spent with Emco Wheaton and other global manufacturing firms. Project managers are a part of the sales negotiation process to gain knowledge of the project from start to finish.
Loading Arm Types
Marine Loading Arm - B0300
Designed for any application where it is essential to keep the product pipe consistently the same size for either economical or technical reasons, e.g. cryogenic products down to -168 °C, piggable systems and PTFE-lining.
Learn More
Marine Loading - Hydraulic QC/DC Coupler for LNG
This variant of our hydraulic QC/DC coupler is specifically designed for the transfer of LNG. High-strength alloy construction ensures infallible performance in temperatures as low as -200°C.
Learn More
Emergency Release System (ERS) for LNG
The Emco Wheaton ERS (Emergency Release System) for LNG is specifically designed to enable rapid and secure disconnection of the LNG Marine Loading Arm. This key element ensures the loading arm is safely disconnected before the LNG carrier becomes out of reach.
Learn More
Bottom Loading Station
This type of loading arm is specially designed to load products where vapour return is necessary.
Learn More
Bottom Loading & Unloading
Bottom transfer arms are especially designed to load products where vapor return is necessary while providing an extended reach that makes them ideal for applications where a vehicle cannot be accurately spotted.
Learn More
LNG Loading Arm Operation
LNG Loading Arm Operation
Emco Wheaton has the pedigree, knowledge, innovative attitude and skills required to produce world-leading equipment which will solve all your LNG loading needs. In addition to their expertise in cryogenic marine loading arms, Emco Wheaton has successfully designed, built, and delivered complete marine loading packages tailored to LNG and high-pressure natural gas applications.
Key Benefits
Key Benefits
We leverage our experience and expertise to provide our customers with engineered LNG loading solutions that deliver benefits such as:
- Maximum Safety. Our marine loading arms are designed to meet the stringent safety and availability requirements of the LNG industry. They are designed to ensure the right balance throughout all maneuvering and connecting positions. Our Emergency Release System (ERS) guarantees safe operation by allowing for the rapid and automatic release of the loading arm from the LNG tanker in the event of an emergency.
In addition, Emco Wheaton’s ERS is able to simulate an emergency without real disconnection. For truck (un)loading of LNG, we provide bottom loading from the ground to be inherently safer for the operator.
High Quality. Depending on your operational needs, the loading arms can be equipped with a robust high-quality support structure and a range. We use the best materials and components to provide you with a robust and durable marine loading arm.
Easy Handling. Our LNG loading arms are designed for easy use and handling. - Full Project Management Support. From conceptual design to construction, commissioning and aftermarket services. A dedicated project management team is allocated to every LNG project run by Emco Wheaton. Emco Wheaton has been delivering LNG projects for decades.
We work with a range of EPC (Engineering, Procurement and Construction) and energy companies to meet demanding technical requirements and unique needs. Project managers take part in the sales negotiation process to ensure they have solid knowledge of the project from start to finish. - Minimum maintenance. Emco Wheaton’s LNG loading arms have a simple and maintenance friendly design. Our dedicated service team offers you full aftermarket support.
Service Support. Emco Wheaton is part of the Ingersoll Rand group. With an extensive network of skilled and certified service engineers, we have the ability to support any cryogenic application, including LNG requests.
Safety Considerations in LNG Operations
Safety Considerations in LNG Operations
As a cryogen, LNG must be transferred and stored in specialized equipment and tanks in order to keep the fuel in a liquid state. Emco Wheaton LNG marine and distribution loading arms have been developed to meet the stringent standards demanded of the industry.
Our engineers understand the requirements of the industry. They work closely with our project managers and clients to create products that meet all their needs.
We have formed a robust knowledge base via our industry links. We ensure a range of provisions are included in our products to ensure their safe operation.
- The use of hydraulic couplers to reduce operator interaction
- The use of an emergency release system
- The use of robust control systems
Maintaining LNG-handling equipment regularly is a necessity. We offer service contracts delivered by LNG technicians.
Quality Standards
Emco Wheaton meets the industry’s high standards on safety and reliability. The safety and integrity of our customers’ operations are our top priority. This is why our range of products are engineered to meet and exceed the highest levels of quality possible.
Downloads
The Importance of Project Management
Emco Wheaton has delivered LNG projects for decades. We extensively work with EPCs, and we are aware of the need for a precise quote and project plan.
A dedicated project management team is allocated to every LNG project run by Emco Wheaton. The importance of a good team and a good process cannot be underestimated. We have achieved great business results with the help of our first-class project management professionals.
A well-run project is the difference between delivering a successful outcome and one plagued with issues from start to finish. We employ project managers with years of experience both through their time spent with Emco Wheaton and other global manufacturing firms. Project managers are a part of the sales negotiation process to gain knowledge of the project from start to finish.